350/190/32-ton trestle crane

The crane is installed on a trestle or in a room adjacent to the NPP reactor hall and is used during NPP operation and for construction and assembling operations. The crane is designed for load transportation, including nuclear hazardous loads, from vehicles to the maintenance level of the reactor hall and back.

Load lifting capacity, t

hook during assembly

350.0

Lifting height, m

fork

48.0

fork during operation

190.0

fork with hook

47.0

auxiliary lifting hook

32.0

auxiliary lifting

50.0

hoists

10.0

Number of crane wheels

8

Speed*, m/min

lifting (lowering)

with load

1.0 (0.1)

Total crane mass, t

200.0

w/o load

2.0

Maximum wheel load with no special conditions (normal operation conditions), kN

auxiliary lifting

7 (0.3)

crane travel

12 (0.3)

fork pin extension

0.2

assembly (350 t load)

900

Fork rotation speed, rpm

0.07

operation (190 t load)

750

Fork swing angle

270о

*Landing (positioning) speed values are given in the brackets.